Refine by




Case Studies

 Browse our collection of case studies to see our technology in action.

Collection of data with minimal pressure loss in flowing wells

Setting a critical well barrier in tubing with damaged nipple profiles

Setting a critical well barrier in tubing with damaged nipple profiles.

Collection of data with minimal pressure loss in flowing wells

Collection of data with minimal pressure loss in flowing wells

Collection of data with minimal pressure loss in flowing wells.

Collection of data with minimal pressure loss in flowing wells

Contingency barrier option on high-value subsea wells

Contingency barrier option on high-value subsea wells

Collection of data with minimal pressure loss in flowing wells

Recovery of magnetic junk in high temperature wells

Recovery of magnetic junk in high temperature wells.

Collection of data with minimal pressure loss in flowing wells

Hard scale removal at multiple obstruction points

Hard scale removal at multiple obstruction points.

Collection of data with minimal pressure loss in flowing wells

Retrieval of equipment lost in the well and fast-track production restart

Retrieval of equipment lost in the well and fast-track production restart.

Collection of data with minimal pressure loss in flowing wells

High deviation, heavy-duty fishing, North Sea

High deviation, heavy-duty fishing, North Sea.

Collection of data with minimal pressure loss in flowing wells

Recovery of safety valve lockout tool which had parted downhole

Recovery of safety valve lockout tool which had parted downhole.

Collection of data with minimal pressure loss in flowing wells

Retrieval of sub-surface safety valve (SSSV) with damaged fish neck

Retrieval of sub-surface safety valve (SSSV) with damaged fish neck.

Collection of data with minimal pressure loss in flowing wells

Retrieval of injection valve backed off from 7-in retrievable bridge plug

Retrieval of injection valve backed off from 7-in retrievable bridge plug.

Collection of data with minimal pressure loss in flowing wells

Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger

Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger.

Collection of data with minimal pressure loss in flowing wells

Data acquisition to monitor pressure buildup in a shut-in well

Data acquisition to monitor pressure buildup in a shut-in well.

Bespoke activation tool design

Bespoke activation tool design

Bespoke activation tool design.

Collection of data with minimal pressure loss in flowing wells

Evaluation of an e-line deployed tractor, stroker, and slickline toolstring

Evaluation of an e-line deployed tractor, stroker, and slickline toolstring.

Collection of data with minimal pressure loss in flowing wells

Trial test to remove hard scale from production tubing using mechanical means

Trial test to remove hard scale from production tubing using mechanical means.

Collection of data with minimal pressure loss in flowing wells

Cut wire at rope socket to retrieve stuck toolstring

Cut wire at rope socket to retrieve stuck toolstring.

Collection of data with minimal pressure loss in flowing wells

Retrieval of injection valve from tubing crossover at 10,400 ft

Retrieval of injection valve from tubing crossover at 10,400 ft

Collection of data with minimal pressure loss in flowing wells

High-deviation fishing at depth in the Middle East

High-deviation fishing at depth in the Middle East.

Collection of data with minimal pressure loss in flowing wells

Isolation of failed inflow valve at high deviation

Isolation of failed inflow valve at high deviation.

Collection of data with minimal pressure loss in flowing wells

Location and stabilization of a leak path in the completion string

Location and stabilization of a leak path in the completion string.

Collection of data with minimal pressure loss in flowing wells

Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria

Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria.

Collection of data with minimal pressure loss in flowing wells

Efficient straddle solution enables repair of production Christmas tree

Efficient straddle solution enables repair of production Christmas tree.

Collection of data with minimal pressure loss in flowing wells

Permanent plug keeps P&A project moving

Permanent plug keeps P&A project moving.

Collection of data with minimal pressure loss in flowing wells

Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well

Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well.

Collection of data with minimal pressure loss in flowing wells

Retrievable sand screen anchoring system eliminates leaks

Retrievable sand screen anchoring system eliminates leaks.

Collection of data with minimal pressure loss in flowing wells

Mechanical scale removal saves USD 250,000

Mechanical scale removal saves USD 250,000.

Collection of data with minimal pressure loss in flowing wells

PTTEP gas lift straddle conversion restores oil production for mature well

PTTEP gas lift straddle conversion restores oil production for mature well.

Slickline-deployed plug isolates damage to avoid workover

Slickline-deployed plug isolates damage to avoid workover

Slickline-deployed plug isolates damage to avoid workover.

KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system

KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system

KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system.

Collection of data with minimal pressure loss in flowing wells

D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well

D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well.

Collection of data with minimal pressure loss in flowing wells

Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo

Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo.